Warning: Undefined array key "wpgmza-gutenberg" in /var/www/vhosts/macduffshipdesign.com/httpdocs/wp-content/themes/Divi/includes/builder/feature/JQueryBody.php on line 249

News

16.00m Harbour Tug “Acamar” Launched

16.00m Harbour Tug “Acamar” Launched

The 16.00m Harbour Tug "Acamar" has been rolled out of the shed at Macduff Shipyards, the interior outfitting is almost complete and she is on target to being launched in July with a hand over to her Shoreham based owners in August.

read more
“Our Olivia Belle” Vessel Design Sold

“Our Olivia Belle” Vessel Design Sold

Macduff Ship Design has sold the vessel design of the ‘Our Olivia Belle’ to S.E.E. Merre shipyards Construction Navale www.chantier-merre.fr. The shipyard will use the original design as a basis for the production of a new vessel for local owners. Macduff are...

read more
25 Years Business

25 Years Business

Macduff Ship Design celebrated 25 years of successful business with a lunch held at the offices and inviting the founding members of the company back to see how the business has progressed.

read more
Pilot Vessel “Scotia” Performing Well

Pilot Vessel “Scotia” Performing Well

The recently handed over "Scotia" a Pilot vessel built for ABP Ayr Harbour has been performing very well, designed to be a capable pilot and harbour workboat. Below she is assisting a ship at the Ayr Harbour.

read more
16.00m Tug Building

16.00m Tug Building

The 16m Tug building in Macduff Shipyards for Shoreham port has had the wheelhouse fabricated and will be ready for internal outfitting to start.

read more
High Commendation for “Scotia”

High Commendation for “Scotia”

Macduff recieved a high commendation for their recently built vessel "Scotia" for ABP Ayr Harbour from the port authority themselves. "We have been doing all sorts of things with her already, pilot duty, mooring assist in adverse weather. The boat handles very well...

read more
16.8m Workboat

16.8m Workboat

Tor Marine has completed a 16.8m workboat based on the 14.9m general service vessels with an additional 1.9m lengthened section.

read more